1. Operate the mixing tank at a high speed for 1-2 minutes, then lower it and mix the concrete thoroughly. Add water as needed to make the concrete more evenly mixed and easy to lower.
2.排干物料后,將汽車(chē)盡可能停在平坦的表面上,并弄濕料斗斜槽以利于清潔。
2. After discharging the materials, park the car on a flat surface as far as possible, and wet the hopper chute to facilitate cleaning.
3.取出時(shí)更好查看材料,以免操作彈出桿。更好在轉(zhuǎn)動(dòng)中間位置時(shí)停止油箱,以保護(hù)減速器,支撐輪等。
3. It is better to check the material when taking it out to avoid operating the ejecting rod. It is better to stop the oil tank when turning the middle position to protect the reducer, supporting wheel, etc.
4.洗瓶時(shí),必須仔細(xì)洗凈,將水反復(fù)倒轉(zhuǎn)兩次,將水箱中的水倒入瓶中,返回工位并向瓶中加水徹底清潔。
4. When washing the bottle, you must wash it carefully, turn the water back twice, and finally pour the water in the water tank into the bottle, return to the working position and add water to the bottle for thorough cleaning.
自上料混凝土攪拌罐車(chē)在卸料中應(yīng)該要注意什么問(wèn)題?
What problems should be paid attention to in discharging of self loading mixer?
為了在自上料混凝土攪拌罐車(chē)設(shè)備運(yùn)行期間確保設(shè)備的良好運(yùn)行性能,有必要了解這些注意事項(xiàng)。避免由于對(duì)設(shè)備的了解不足而影響正常施工過(guò)程的操作錯(cuò)誤。
In order to ensure the good operation performance of the self loading mixer during operation, it is necessary to understand these precautions. Avoid the operation error that affects the normal construction process due to insufficient understanding of the equipment.


正確使用自上料混凝土攪拌罐車(chē)
Proper use of self loading mixer
剛從自上料混凝土攪拌罐車(chē)出來(lái)的混凝土是起始材料,但只是在原料之后進(jìn)行混合。為了確?;炷恋木鶆蛐?,需要在自上料混凝土攪拌罐車(chē)中進(jìn)行第二次攪拌。
The concrete that just came out of the loading mixer is the starting material, but it is only mixed after the raw material. In order to ensure the uniformity of concrete, it is necessary to carry out the second mixing in the self loading mixer.
自動(dòng)進(jìn)料和混合過(guò)程中的二次攪拌是一個(gè)很深的過(guò)程,而不是簡(jiǎn)單的旋轉(zhuǎn)。儲(chǔ)罐的轉(zhuǎn)數(shù)對(duì)于混凝土的均勻性尤為重要,更好為6-8 rpm。如果速度太慢,則混凝土內(nèi)部的粗骨料將沉降,并且速度過(guò)快,這將對(duì)駕駛員的安全產(chǎn)生一定的影響,并增加混凝土的水分。坍落度的增加影響卸載;混凝土的初始固化時(shí)間通常為3-6小時(shí)。短期交通擁堵對(duì)混凝土影響不大。如果擁塞時(shí)間過(guò)長(zhǎng),則需要將混凝土罐的速度加快1到2倍,并且如果水罐旋轉(zhuǎn)異常,則需要小心。如有必要,可以添加水以保持混凝土的容易性。
The secondary mixing in the automatic feeding and mixing process is a deep process rather than a simple rotation. The number of revolutions of the tank is particularly important for the uniformity of the concrete, preferably 6-8 rpm. If the speed is too slow, the coarse aggregate inside the concrete will settle, and the speed is too fast, which will have a certain impact on the safety of the driver and increase the moisture content of the concrete. The increase of slump affects unloading; the initial curing time of concrete is usually 3-6 hours. Short term traffic congestion has little effect on concrete. And if the water tank is too long to rotate, it will need to be careful if the water tank is too long to rotate. If necessary, water can be added to maintain the workability of the concrete.